Water & Waste Water – Current Projects

Water & Waste Water – Current Projects

PROFILE FOR SANITATION FACILITIES AND OTHER PROJECTS
 
Project Name/Number
Project Cost
Agency
Funded
Funding Request To
1
Cedarville Storage Tank and Booster Station (AL-04-208) – Design 50% complete.  The SOW for this project has changed considerable due to the 2014 Hydraulic Analysis Report that just came out.  The size and location of the tank has been relocated to the mesa above Marcus Chavez residence rather than above the cemetery.  This provides better benefit for the overall system,  while still boosting water pressure in the Cedarville area.  Part of the 2014 Hydraulic Analysis Report (HAR) 
$465,000.00
IHS
Yes
IHS SDS
2
Acomita Sewer Main Extension (AL-14-190) – (a.k.a. Skyline Interceptor Project) funding has been secured for design, construction and inspection of the 14,000 linear foot 6″ forced main connecting the Skyline Lagoons with the North Acomita Wastewater Treatment Facility.  the design and pre-construction services for this project will begin within May 2015.  Issue with the State regarding IHS procurement.
$1,218,000.00
HUD, NM Capital Outlay
Yes
$1,000,000 2013 HUD IHP PAHA; $218,000 2014 NM Capital Outlay
3
Acoma Public Water System Improvements (AL-14-A05) – This project will provide the necessary piping and appurtenances to connect the new Cedarville Storage Tank, Anzac Well #8 and Anzac Well #7 to the Public Water System with over 5000 LF of water main to include new electrical lines to tank and pump locations.  In addition, this project will install the pump, drop pipe, cable, controls and SCADA necessary for full automation of the public water system.  Part of 2014 HAR
$993,000.00
IHS
Yes
IHS 2014 SDS
4
Acomita Water Looping Project (AL-15-xxx – This project will provide a new 10″ main line from the existing system near Burger Barn and continue along Veterans Blvd. to connect to existing waterline at the ACL Hospital Complex.  In addition, project will install a community with PRV station near ghost town and will reduce system pressure in N. & S. Acomita from 150 psi to 40-50 psi.  Part of 2014 HAR
$500,000.00
IHS
Pending
IHS Special Appropriation pending; non-SDS funds
5
Acoma Water Storage Tank Improvements – based on recent tank inspections, Anzac and Skyline tanks have suffered significant deterioration of interior coating and need renovation.  This project will provide the sandblasting and re-coating of the tanks while maintaining system operability.  (Ranked #2 within Albuquerque Area IHS SDS)
$384,900.00
IHS
Yes
Annual SDS
6
Acoma Distribution Line Improvements Project – seeking design and construction funds to complete distribution line and metering upgrades in the McCartys, Beverly Hills and Shutivaville areas.  These are the most aged part of the community water system and are typically undersized.  Currently working on submission for 2015, also on SDS
$1,746,000.00
 
No
U.S. EPA 2015 DWTSA; Annual SDS; other
7
Acoma Public Water System Metering – 10% of residential homes have new meter system, seeking funding for phased or complete installation for the remainder of the community and government buildings and business.  This will include a drive-by radio read system.  On SDS
$1,998,000.00
 
No
Annual SDS; other
8
North Acomita Wastewater Treatment Facility Expansion – seeking funds to complete design and construction.  This project will be needed in order to completely eliminate the need for the Skyline Lagoon facilities and is in conjunction with the Acomita Sewer Main Extension Project.  This will be on the 2015 SDS
$2,600,000.00
 
No
2015 NM Water Trust Fund Board (NMFA); Annual SDS
9
McCartys Wastewater Improvements– Design complete, seeking funding sources for construction.  On SDS
$4,243,000.00
 
No
Annual SDS; other
10
Anzac Wastewater System Improvements – seeking funds to design and construct community based wastewater system in Anzac. On SDS
$1,851,000.00
 
No
Annual SDS; other
11
Acomita Lake Interceptor Project – seeking funds to design and construct interceptor line in Acomita Lake area that will transport the wastewater to N. Acomita WWTF.
$3,500,000.00
 
No
Annual SDS; other
12
Beverly Hills Water Looping – seeking funds to complete design and construction.  On SDS
$216,000.00
 
No
Annual SDS; other
13
Transfer Station Waterline Extension – seeking funds to complete design and construction.  On SDS
$139,000.00
 
No
Annual SDS; other
14
Acoma SCADA Improvements – seeking funds to complete construction.  On SDS
$280,000.00
 
No
Annual SDS; other
15
Acoma Water System Improvement (a.k.a. Anzac to Skyline Phase IV) – seeking funds to complete design and construction.  On SDS Part of 2014 HAR
$1,435,000.00
 
No
Annual SDS; other
 
 
SANITATION FACILITY CONSTRUCTION PROJECTS
  Project Name/Number Project Cost Agency Funded Funding Request To
1
Drainfield Replacement Project (AL-14-186) – construction on this project is on-going. (15 homes should be served under this grant)
$267,800.00 
IHS
Yes
IHS  2014 SDS
2
Drainfield Replacement Project (AL-14-193) – construction on this project is on-going.  (5 homes will be served under this grant)
$84,900.00
IHS
Yes
IHS 2014 SDS
3
Waterless Composting Toilet Project Phase I – final approval from Caciques anticipated this week.  Contracts will be issued to Advanced Composting System to build 5 additional buildings and arch to be completed prior to field activities.  6 stall bid to be completed by July 2015, remaining bids to be completed by November 2015.
 
NM IAD
Yes
Acoma Match $71,500.00 included
4
McCartys Bridge Crossing WL Improvement (AL-13-181 – Contractor, Velocity Build, has been secured.  They are obtaining work permits from NMDOT and construction shall begin within March 2015 to include removal of existing water line on bridge and installation of new 10″ HDPE line underneath Rio San Jose Part of 2014 HAR
$280,000.00
IHS
Yes
IHS 2014 SDS
5
Anzac Well #8 Pumphouse (AL-07-866) – Design 95% complete.  IHS will perform a design review to incorporate latest design recommendations and final design will be completed within two weeks of design review.  Project will be in construction Summer 2015.  Part of 2014 HAR
$307,911.00
IHS
Yes
IHS SDS
 
 
OTHER PROJECTS (NON SANITATION)
  Project Name/Number Project Cost Agency Funded Funding Request To
1
Acoma Community Center Upgrades (B-08-SP-NM-0331) – ADA powered doors, card swipe door system, security camera upgrades, north parking lot lighting, sewer equipment.
$49,000.00
HUD
Yes
HUD EDI SP
2
Acoma Community Center Upgrades (B-09-SP-NM-0381) – Engineering and inspection services, north parking lot asphalting, commercial loading dock.  Project in the bidding phase.  Construction to start within March 2015.
$142,500.00 
HUD
Yes
HUD EDI SP
 
 
TOTAL UNFUNDED (NEED)                                                                                                               
$18,008,000.00
TOTAL FUNDED
$4,693,011.00
GRAND TOTAL
$22,701,011.00